Where it counts, the moment it counts.
The plan: The engine runs on the site's own gas, so the site buys less power. Surplus gas is exported to the gas grid.
The plan: Import is cheaper than generation, so the engine is on standby. The boiler heats the digesters and the gas holder fills.
The plan: The engine and solar generate more than the site needs. The surplus is exported to the grid.
Assets, limits, plans you can trust and verify.
Illustrative. The same model fits any plant that turns waste into energy.
Generation runs through every peak. Every peak covered is paid.
The same plan lowers cost and carbon, within every operating limit.
Illustrative site. Grid carbon: NESO, January 2026 weekdays, CC BY 4.0.
Built with operators in energy from waste, biomass and biogas. Partners shape the roadmap and get first access.